| False front for the upper level track
A couple years ago the mainline was doubled around the room. The only
way to go along this wall was to raise the right-of-way over the top of
the existing scenery. The sub roadbed is 3/8 continues plywood with a plywood
scab every eight feet. I used mat board, card stock paper and strip wood
to make the "false front" plate girder bridge sections to cover
the edge of the plywood. To hide the scab of plywood, an extra steel beam
was modeled with the same material and placed under the plate girders. I
can skip this beam at the right as there aren't and more joints for a few
more feet. This trick only cost me a buck, but took way too much time. |